Responsive heating for the Cheesegrater

The Leadenhall Building in the City of London has been provided with space heating. Designed by Rogers Stirk Harbour & Partners, the 224 m high, 52 storey building has a distinct tapering shape. It is being constructed by Laing O'Rourke using Building Information Modelling techniques and will incorporate retail outlets, a restaurant, two reception levels and 41 floors of offices. Three Stokvis 1.5 MW boilers fitted with Riello modulating burners have been supplied. The Stokvis Rex 160F boilers, fitted with Riello RS120 fully modulating burners, were selected by Crown House Technologies working to a specification by Arup. Over 83% of the construction works for The Leadenhall Building took place off site.

> Back to case studies

Get In Touch With Us...

Please contact us directly on +44 (0)330 236 8630, or alternatively send your enquiry through using the form below.

I give consent for Riello Burners to contact me via the following methods for marketing purposes:

 
 

Copyright © Riello Limited 2024
Site by Verto

Signup to our Newsletter

Riello Burners UK

The Ermine Centre, Ermine Business Park, Huntingdon, Cambridgeshire. PE29 6WX

Contact Us

t: +44 (0)330 236 8630
e: [email protected]